Events, construction sites, temporary promotions and outdoor announcements
Choose the right specification
An exposed fence banner has different requirements from an indoor hanging banner. Share the display period, wind exposure, fixing surface and responsible installer. The finishing allowance and material should follow those conditions; adding eyelets to a standard rectangle without planning the placement can compromise both the message and fitting.
- Measure the actual fixing area, not just the available wall.
- Tell us whether the banner faces wind and how long it must stay up.
- Specify hems, eyelets or other finishing based on the installation plan.
Planning example: a temporary outdoor promotion
Photograph the exact fence or wall and measure its clear fixing area. A large graphic can behave differently in wind from a small indoor panel. Discuss the material and fixing plan before treating the artwork dimensions as final.
What to send for a useful quote
Provide dimensions, quantity, location, expected display period, exposure, fixings and deadline.
Design for viewing distance and include bleed and a generous safe area around hems and eyelets; confirm finishing allowances before export.
A question we hear
Is PVC right for a windy fence?
It depends on the location and fixing. Describe the site so the team can compare suitable material and finishing choices.
Plan the file and approval
Approve the visible message together with the hem and eyelet plan. Keep text and faces clear of fixing areas, check photographic detail at the final enlarged dimensions and confirm the finished size before export.
Useful next steps
Practical questions
Why do eyelets and hems change artwork?
Fixing points and reinforced edges use space. Leave text, faces and logos clear of these areas, and ask for the finish allowance before export.
How should I specify the installation?
Send the finished size, indoor or outdoor location, display period and fixing method. If wind exposure or public access matters, identify who is responsible for installation and site approval.